The roth showroom

IMD trim mold 1-cav

Cavitation

Clamp force

Material

Gating

Technology

1-cav

500 t

PC-ABS

5x Cascade valve gate

High-gloss finishing

 

Decoration is key

  • Diverse decoration opportunities
  • Reduction of non-productive times due to film roll changes in less than 5 minutes
  • Tool out of a package designed for rapid mounting
IMD trim mold 1+1-cav

Cavitation

Clamp force

Material

Gating

Technology

1+1-cav

400 t

PC-ABS

3x cascade valve gate

High-gloss finishing

 

Maximum decoration diversity

  • Reduction of non-productive times due to film roll changes in less than 5 minutes
  • Tool out of a package designed for rapid mounting
  • Ultimate decoration diversity
  • Distinctive aesthetic combined with unique functionality
  • Highest homogeneity

102-IMD-trim-mold-1+1-cav

3-cav trim mold

Cavitation

Clamp force

Material

Gating

Technology

1+1+1-cav

1.000 t

PP-ABS

Cascade

High-gloss finishing

 

Limitless decoration

  • Exterior automotive application
  • Reduction of non-productive times due to fast design changes in less than 5 minutes
  • 3 different parts out of one tool
  • Decoration of large components (> 900 mm)
  • Distinctive aesthetic combined with unique functionality

103-IMD-trim-mold-3-cav

IMD trim mold 4-cav

Cavitation

Clamp force

Material

Gating

Technology

4-cav

500 t (250 t)

PC-ABS

2x cascade valve gate

High-gloss finishing

 

Full decoration freedom

  • Diverse decoration opportunities
  • Reduction of non-productive times due to film roll changes in less than 5 minutes
  • Tool out of a package designed for rapid mounting
IMD plus mold

Cavitation

Clamp force

Material

Gating

Technology

1-cav

500 t

PC-ABS

3x cascade valve gate

High-gloss finishing

 

100% effectivity

  • Extreme decoration depth
  • Reduction of non-productive times due to fast design changes in less than 5 minutes
  • No cold runners means no waste = 100% effective
  • Distinctive aesthetic combined with unique functionality
  • Highest homogeneity

105-IMD-plus-mold

2K-fuel filler mold

Cavitation

Clamp force

Material

Gating

Technology

1/1-cav

600 t

PP-GF / TPE

Direct

Transfer molding

 

Less space, more comfort

  • Extremely complicated demolding mechanism
  • Transfer technique for compact tool structure
  • Significant space reduction on the machinery
  • Process optimization project

106-2K-fuel-filler-mold

IMD + IML mold 160 t

Cavitation

Clamp force

Material

Gating

Technology

1-cav

160 t

PMMA

2x cascade direct

High-gloss finishing, sensor film

 

Perfection in display

  • Single frame decoration
  • Molded display for most effective production process; time & space savings
  • Functional integration substitues complete subassemblies
  • Process optimization & efficiency enhancement project

107-IMD+IML-mold-160t

IMD + IML mold 350 t

Cavitation

Clamp force

Material

Gating

Technology

1-fach

350 t

PMMA

2x cascade direct

High-gloss finishing, sensor film

 

Superior high-gloss finishing for a unique user experience

  • Single frame decoration
  • Reduction of non-productive times due to fast design changes in less than 5 minutes
  • Functional integration substitues complete subassemblies
  • Process optimization & efficiency enhancement project

108-IMD+IML-mold-350t

 

Do you already know our tryout center for sampling?

Have a look inside here as well:

 

In-house tryout center
  • Sampling and optimisation of tools for reusable packaging and logistics containers
  • 4 fully hydraulic CX- or MX-series machines by KraussMaffei
  • Clamping force range 110 to 1,300 tonnes
  • Multicomponent equipment on all machines up to 3K
  • KUKA 6-axis robots on all machines for fully automatic part removal
  • Optional: storing positions for up to 3 optionally inclusive automation at our in-house tryout center

Tryout Center for thin-wall

  • Specifically for applications in the thin-wall and in-mold-labelling sector
  • 2 high-speed machines: Netstal EVOS 3500 and EVOS 5500 (350- and 550-tonne clamping force)
  • In-house development by roth: modular IML automation
  • Highlight: sampling including labelling in cycle time close to series production
  • Multicomponent equipment on both machines for 2K applications
  • Sampling of stack molds
  • Preparation of ICM (injection compression molding)

MACHINERY OF OUR IN-HOUSE TRYOUT CENTER

Netstal EVOS 3500-2000 (2K)

  • maximum clamping force 350 t
  • unit 2000 hybrid
  • 6-axis-industrial robot ABB IRB 6700-205/2,80
  • clamping surface 730 mm x 1150 mm
  • interface bolt-on for 2nd component (vertical)
  • setup for single face and stack molds

Netstal EVOS 5500-2900 (2K)

  • maximum clamping force 550 t
  • unit 2900 hybrid
  • 6-axis-industrial robot ABB IRB 6700-205/2,80
  • clamping surface 1020 mm x 1350 mm
  • interface bolt-on for 2nd component (vertical)
  • setup for single face and stack molds

KraussMaffei KM 110 380-180 CXZ (3K)

  • maximum clamping force 110 t
  • main injection unit SP 380
  • second injection unit SP 180 (piggyback)
  • interface bolt-on for 3rd component (vertical)
  • clamping surface 745 mm x 770 mm
  • index drive
  • rotating plate
  • 6-axis-industrial robot ABB

KraussMaffei KM 250 1000-380 CXZ (3K)

  • maximum clamping force 250 t
  • main injection unit SP 1000
  • second injection unit SP 380 (piggyback)
  • interface bolt-on for 3rd component (vertical)
  • clamping surface 955 mm x 1050 mm
  • index drive
  • rotating plate
  • 6-axis-industrial robot KUKA

KraussMaffei KM 500 3000-750 (3K)

  • maximum clamping force 500 t
  • main injection unit SP 3000
  • second injection unit SP 750 (piggyback)
  • interface bolt-on for 3rd component (vertical)
  • clamping surface 1270 mm x 1200 mm
  • index drive
  • 6-axis-industrial robot KUKA

KraussMaffei KM 1300 6100-750 MXZ (3K)

  • maximum clamping force 1300 t
  • main injection unit SP 6100
  • second injection unit SP 750 (piggyback)
  • interface bolt-on for 3rd component (vertical)
  • clamping surface 2210 mm x 1910 mm
  • index drive
  • rotating plate
  • 6-axis-industrial robot KUKA

vertical unit bolt-on 55 C
vertical unit bolt-on 380 CX


We are guided by our mission to deliver turnkey mold and tool solutions to start series production immediately with; to avoid non-production and idle times. Therefore, we are also capable to store in your machine at our tryout center.

A machinery list of the roth Tryout Center can be easily downloaded in our download section.